How to Calculate Production Cost Per Unit: A Worked Example

Learn how to calculate production cost per unit with a practical manufacturing example. Discover how direct materials, labor, and manufacturing overhead determine the true cost of a finished product. Follow a worked example of an upholstered chair, compare standard and actual production costs, and see how integrated ERP software helps manufacturers track cost variances, reduce waste, and protect profit margins.

Table of Contents

TL;DR - Understanding Production Cost Per Unit

Accurate production costing starts with reliable material, labor, and overhead records, not estimates kept in separate spreadsheets.

Use the correct formula.

Add direct materials, direct labor, and manufacturing overhead, then divide by the number of good units produced.

Calculate costs from operational records.

Bills of materials define component consumption, routings establish labor requirements, and work center rates allocate overhead.

Compare planned and actual production costs.

In the article's illustrative example, an upholstered chair costs €129.50 under standard costing but €139.50 in actual production, a 7.72% unfavorable variance.

Include scrap and rework.

Unrecorded material losses and rejected products can make unit costs appear lower than they actually are.

Connect manufacturing with ERP.

SIX ManufacturingFlow, StockFlow, PurchaseFlow, and FinanceFlow provide connected records for investigating costs, material consumption, labor, and manufacturing performance.

Production cost per unit equals direct materials plus direct labor plus manufacturing overhead, divided by the good units produced. Applied to one upholstered chair, €72.00 of materials, €34.50 of labor and €23.00 of allocated overhead give a standard production cost of €129.50 per chair.

Most manufacturers can quote a unit cost for their own product. Fewer can take it apart. Ask which BOM line produced the €72.00, which routing step produced the 2.30 hours, or which work order produced the €23.00 of overhead, and the answer usually turns into a spreadsheet hunt.

That gap between knowing the number and defending it is where margin leaks. A unit cost you can’t trace is an average of old purchase prices, planned times nobody revised, and overhead spread evenly across products that don’t consume resources evenly. It holds up right until a customer asks for a quote on a high-complexity, low-volume variant.

Estimated cost and actual cost are two different figures, and the distance between them carries the operational story. One is built before the work starts, from the bill of materials and the routing. The other is recorded after the order closes, from material consumed and hours booked. Getting how to calculate production cost per unit right means building both and comparing them every month.

The Formula and Its Three Cost Components

Production cost per unit is built from three cost lines, each drawn from a different record: materials from the bill of materials, labor from the routing, overhead from the cost center ledger. Add them together and divide by the good units that came off the line.

Production cost per unit = (direct materials + direct labor + manufacturing overhead) ÷ good units produced.

Direct materials are the raw materials, purchased components, subassemblies and packaging that end up in the product, plus the planned waste allowance written into the bill of materials (BOM). The BOM lists what goes into one finished item and in what quantity. If the BOM allows 2.5 meters of fabric, that allowance sets the standard material cost; waste beyond it is recorded as a variance.

Direct labor is the time people spend making the product. It comes from the routing, which holds the sequence of operations, work centers and planned times for one unit. Multiply planned hours by the labor rate at each operation, then replace the plan with recorded hours when the work order closes.

Manufacturing overhead is everything indirect that keeps the plant running: machine operating costs, energy, equipment depreciation, maintenance and factory supervision. It reaches the product through an allocation base you can defend, and the base matters more than the total. A chair that spends most of its routing time in an expensive work center should carry more of that center’s cost than one that passes through in minutes.

Labor has a useful cross-check. The U.S. Bureau of Labor Statistics defines unit labor cost as hourly compensation divided by labor productivity, which is output per hour worked. A routing-based labor cost applies the same arithmetic at the product level, one work center at a time.

What stays out: Selling, general and administrative expenses do not belong in unit cost. Sales commissions, marketing, head office rent and finance costs are period expenses. Loading them into inventory value inflates stock and hides the actual gross margin.

When a method assigns a share of fixed factory overhead to every unit, the result is a fully absorbed cost. That is the figure pricing and inventory valuation need, because it carries the cost of running the plant alongside the cost of the material.

Each component answers to a different record, which is what lets you defend the total line by line.

Cost componentWhat it includesChair exampleSource record
Direct materialsBOM quantities, purchased components, subassemblies, packaging, planned waste€72.00BOM and material consumption records
Direct laborPlanned operation times at labor rates, plus recorded employee hours€34.50Routing and work order time records
Manufacturing overheadMachine operating cost, energy, depreciation, maintenance, supervision€23.00Cost center ledger and allocation rates
Excluded from unit costSelling, general and administrative expenses such as sales commissions and head office rentNot includedGeneral ledger as a period expense

Costing One Upholstered Chair Step by Step

Everything below is illustrative, in EUR per finished chair, not a measured customer result. It shows the arithmetic and the record behind each line.

  1. Price the BOM quantities. Multiply each component quantity by its standard cost. The wooden frame is €28.00, foam and padding €14.00, upholstery fabric 2.5 meters at €22.50, fittings and fasteners €4.50, and packaging €3.00. Total materials come to €72.00 per chair.

  2. Build labor from the routing. Frame preparation takes 0.40 hours, upholstery 1.20 hours, final assembly 0.50 hours and quality control 0.20 hours, for 2.30 hours in total. At a standard rate of €15 per hour, direct labor is €34.50.

  3. Apply overhead through work center rates. The upholstery center carries €12 per labor hour, so 1.2 hours of upholstery work absorbs €14.40. Add the other centers’ rates and allocated overhead for the chair reaches €23.00.

  4. Add the three lines. Materials plus labor plus overhead gives €72.00 + €34.50 + €23.00 = €129.50 per chair. Materials and labor alone are €106.50 before overhead, which is the number you’d quote if you forgot the plant exists.

  5. Divide by good units. The per-unit build above starts from a single chair, but real orders run in batches. Divide the batch total by the good chairs completed, not by the chairs started, so scrap and rework land on the units that can be sold.

The BOM behind step one looks like this.

BOM componentQuantityStandard cost
Wooden frame1 piece€28.00
Foam and padding1 set€14.00
Upholstery fabric2.5 m€22.50
Fittings and fasteners1 set€4.50
Packaging1 set€3.00
Total materialsAll components€72.00

The same numbers read better as a single stack: materials at the bottom, labor in the middle, overhead on top, with €129.50 as the top edge of the bar.

A detailed infographic showing the step-by-step breakdown of costs involved in upholstering a single chair.

Two details in this example carry more weight than they look. The 0.20 hours of quality control is a real cost of making a saleable chair, so it belongs in the routing rather than in an admin budget. And the €23.00 of overhead is not a guess spread across the factory. It’s the sum of work center rates applied to the time this product spends in each center.

Allocating Overhead Fairly Across Products

Overhead is indirect, so it needs a driver, the measure that links indirect spending to a product. A predetermined overhead rate is estimated overhead divided by the estimated activity in that driver, calculated before production starts. The accounting guide on assigning manufacturing overhead makes the point: the allocation base should reflect how resources are consumed, because an unsuitable base distorts product costs and pricing decisions.

The chair’s upholstery center uses €12 per labor hour. That rate is defensible because upholstery is hand work, and an hour of it consumes roughly an hour of supervision, floor space and energy. Handing a machining center the same €12 rate would not be defensible.

Which allocation base fits your plant

  • Direct labor hours. Best fit for assembly-heavy plants where people, not machines, set the pace.
  • Machine hours. Best fit for automated cells, where depreciation and energy track run time.
  • Direct labor cost. Simple to administer, but a wage increase moves the allocated cost with no change in effort.
  • Work center rates. Best fit where separate cells have different cost structures, as with upholstery against cutting.
  • Activity drivers. Setups, inspections and purchase orders fit mixed product lines with very different batch sizes.

A single plant-wide rate built on labor hours makes labor-intensive products look expensive and understates the cost of products that consume more machine time, setups, quality checks or rework, as Investopedia’s production cost overview points out. The contrarian risk is worse than mispricing. A falling average unit cost can mean the plant produced a high volume of easy units while a handful of complex, low-volume products ate the capacity.

Practical rule: Set the overhead rate on normal capacity, not maximum theoretical capacity. A rate built on full capacity spreads overhead too thinly, understates unit cost, and overstates profit on every quote.

Activity-based costing fixes the cross-subsidy when complexity varies. The sequence is documented in Iowa State’s managerial accounting chapter: identify activities, group costs into pools, calculate activity rates, allocate rates to products, then calculate unit product costs. Reconcile total allocated overhead back to the general ledger before you trust any product cost built on it. Separate cost centers per production cell make the whole method easier to run, and the difference between a cost center and a profit center decides who owns the number when it moves.

Process Costing for Continuous Production

Not every plant builds to an order. Mixing, molding and bottling run a steady flow, and there the unit cost comes from process costing rather than job costing. Dividing total cost by physical units fails, because at month end some units are still half finished.

The fix is equivalent units, which convert partly finished work in process into the finished units it represents. LibreTexts’ guide to determining equivalent units sets out the weighted-average version: units completed and transferred out, plus ending work in process multiplied by its completion percentage.

Say a plant completes 8,000 units this month and leaves 2,000 in process at 40% complete. Equivalent units are 8,000 plus 800, so 8,800. With total cost for the month, including beginning work in process, of €176,000, the cost per equivalent unit is €20.00. Completed units carry €160,000 and ending work in process carries €16,000.

  1. Count physical units at each stage.
  2. Calculate equivalent units separately for materials, labor and overhead, since materials often enter at the start of the process while labor and overhead build gradually. The process costing notes from CSUN warn that treating every component at one completion level overstates or understates inventory and finished-unit cost.
  3. Add beginning work-in-process cost to current-period cost.
  4. Divide that total by equivalent units.
  5. Apply the rate to completed units and to ending work in process.

Plants that run steady flow and custom orders side by side keep both methods running, which is where managing the manufacturing process in ERP earns its keep.

Keeping BOMs, Routings and ECOs Current

A standard cost is only as good as the BOM and routing underneath it. Follow the chain and you can see where each euro enters: BOM, routing, work order, actual consumption, unit cost, then into financial records. That chain is what turns a planned €129.50 into a recorded figure you can trust or challenge.

A BOM lists components and quantities. A routing lists operations, work centers and planned times. A chair uses multi-level BOMs, where a frame set and a cushion set are built as subassemblies and then consumed by final assembly. Each level carries its own quantities and standard prices, which is why a change two levels down still moves the chair’s unit cost.

Engineering change orders (ECOs) are the control that keeps those levels honest. An ECO is a documented request to revise a BOM or routing, with an approval step and an impact check on quantities, times and cost. Four triggers account for most of them.

  • A supplier discontinues a component. The ECO swaps the part, updates the quantity, attaches the new standard price and flags any routing step that changes.
  • A component price moves. Update the standard price and the effective date, and leave the old version attached to orders that already ran.
  • A material must be replaced. Check the substitute against the routing, because a different fabric can change cutting time and the planned waste allowance.
  • The production method changes. Rework the operation times and work center assignments, then re-cost the product before the next quote leaves the building.

Traceability is the whole point. Each revision keeps an effective date, a reason, an approver and the orders that used it, so last quarter’s work orders keep last quarter’s cost instead of being rewritten.

SIX ERP turns customer demand into structured manufacturing orders with defined BOMs, routings, work steps, machines, employees and production times, then completes them by receiving approved products into inventory, deducting consumed materials, calculating actual production costs, and continuing into warehousing, delivery and invoicing. Consumption comes from stock, prices come from purchasing, and both feed the standard.

For the structural comparison between single-level and multi-level structures, see types of bill of materials.

A revision rarely shows its cost on the BOM screen. It shows up weeks later, as a gap between what the order was planned to cost and what the records say it did cost.

A financial infographic comparing standard versus actual production costs, highlighting material, labor, and overhead cost variances.

Standard vs. Actual Cost and What Causes the Variance

Standard cost is what good output should cost under current conditions. Actual cost is what the records say it did cost. Both come from the same BOM and routing, and the difference between them is a manufacturing variance.

Cost componentStandardActualVariance
Materials€72.00€76.00+€4.00
Labor€34.50€39.00+€4.50
Overhead€23.00€24.50+€1.50
Total per unit€129.50€139.50+€10.00

These are illustrative figures, not a measured customer result and not a verified customer percentage. On a €129.50 base, €10.00 is an unfavorable variance of 7.72%. Labor moved about 13% above standard and materials about 5.6%, so the two largest lines, not the smallest, explain most of the gap.

The standard cost versus actual cost guide breaks the difference into material price and usage variance, labor rate and efficiency variance, overhead spending variance, and volume or capacity variance. It also flags the mistake that hides a bad rate: using maximum theoretical capacity as the denominator when normal capacity is lower. The standard costing material from Umeschandra College frames the same idea as a total cost variance, the standard cost allowed for actual output minus the actual cost incurred.

Reading a variance without guessing

  • Higher purchase prices show up as a material price variance, not a usage problem.
  • Excess fabric consumption points to cutting waste, material quality, or a specification nobody updated.
  • Longer production times usually mean extra setup, rework, or an operator on an unfamiliar variant.
  • Overhead spending above plan comes from indirect rates or from volume falling short of the denominator.

The investigation path is the same every month. Compare BOM consumption with actual use, planned routing time with recorded hours, and allocated overhead with actual spending. If fabric repeatedly runs over the BOM, check the cutting layout and the material before you touch the standard.

Cost variance only becomes useful when someone can drill into it. SIX ManufacturingFlow compares planned costs with the actual consumption of materials, labor, machine time, waste and additional expenses to show the true cost and margin of every product, and it tracks work orders, machine activity, employee time, quantities, waste and production progress directly from the shop floor.

Monthly control: (actual unit cost minus standard unit cost) multiplied by good units, reconciled to purchasing, inventory, labor-time, production and finance records. Investigate the variance. Don’t average it away.

An infographic comparing standard costs and actual costs, explaining how variances between them occur in business.

Common Costing Mistakes and How to Fix Them

Outdated BOM prices are the most common failure and the cheapest to catch. Pull three high-value components from the BOM, compare their standard prices with the latest supplier invoices, and see how far apart the figures sit. If fabric moved, the chair’s standard cost moved with it, and the last six quotes were built on a number that no longer exists.

MistakeEffect on unit costFix
Outdated BOM pricesStandard cost drifts from real purchase pricesRefresh component prices from current supplier invoices and update the BOM
Missing labor timeLabor looks cheaper than it isRecord employee hours against each work order
Wrong overhead allocationLabor-heavy and machine-heavy products are mispricedMatch the allocation base to how resources are consumed
Unrecorded scrapUnit cost looks better than output really isCapture rejects at production and divide by good units
Wrong units of measureMaterial cost rises or falls by a fixed ratioUse one unit standard across BOMs, purchasing, and stock, such as meters for fabric
Planned output as denominatorUnit cost is understated when output falls shortDivide by actual good units completed
Production cost used as selling priceMargin decisions rest on the wrong numberKeep unit cost, price, and margin in separate reports

Two rows earn extra attention. Scrap recorded nowhere flatters every good unit, so capture rejects, measurements and rework at the point of production, where the inspection happens, rather than at month end from a stock adjustment. And a unit cost carried straight into a price locks a thin margin into every order once admin costs and demand have their say.

The units-of-measure row breaks more costing models than people expect. Fabric bought in yards and specified in meters in the BOM shifts material cost by a fixed ratio on every chair, consistently, until someone compares a purchase order with a work order.

Cut Unit Cost Without Cutting Quality

Reducing unit cost means cutting waste and variability, getting the same output with less material, less overtime and fewer changeovers. Cheaper inputs are a separate project with a separate risk profile.

  • Material planning. Check availability and reserve components before production starts, so you’re not paying premium freight on a rush buy that lands after the order was scheduled.
  • Scheduling. Sequence similar orders back-to-back to shrink changeovers and plan overtime instead of discovering it on Friday afternoon.
  • Purchasing coordination. Align supplier lead times with production dates, because a price break that forces a larger order can cost more in carrying cost than it saves.
  • Waste reduction. Track scrap by cause, then attack the largest cause in the cutting layout.
  • Work center efficiency. Compare planned and actual hours by station and fix the constraint first. An hour saved at a non-bottleneck buys nothing.
  • Continuous improvement. Review variance monthly and change the standard only after an improvement holds for more than one cycle.

Labor costs need regular review. Eurostat reported that hourly labor costs across the EU rose 5.1% in the third quarter of 2024 compared with a year earlier. That figure measures the cost of an hour worked, not the cost of labor per unit produced. Higher hourly costs push unit cost up unless productivity improves enough to offset them, which is why wage rates and routing times should be refreshed together rather than one at a time. For comparison, the U.S. Bureau of Labor Statistics publishes the U.S. manufacturing unit-labor-cost series.

What labor-cost benchmarks can and cannot tell you

Eurostat’s 2024 hourly labor-cost figures provide a consistent comparison within the EU. They cover the business economy, not manufacturing alone, and include wages and non-wage employer costs.

Economy2024 hourly labor costScope
EU average€33.50Business economy
Bulgaria€10.60Business economy
Romania€12.50Business economy
Hungary€14.10Business economy

Bulgaria’s reported rate was about 32% of the EU average. That difference is a benchmark for employer cost per hour, not proof that a chair made in Bulgaria costs 68% less to produce. Routing time, productivity, scrap and overhead still determine labor cost per good unit.

For a comparison that includes the US and Asia, the BLS international manufacturing series uses one hourly compensation definition across countries. Its published figures are historical, so the table below shows 2012 data, not today’s labor costs.

Economy2012 manufacturing hourly compensationScope
United States$35.67Manufacturing
Japan$35.34Manufacturing
South Korea$20.72Manufacturing

BLS includes direct pay, employer social-insurance expenditures and labor-related taxes, with amounts converted to US dollars at prevailing exchange rates. The Eurostat and BLS tables cover different years and sectors, so do not compare their euro and dollar figures directly or use either table as the chair’s €15 routing rate. Use current local payroll costs and recorded hours for a product quote.

Quality is the guardrail on every cost change. Check each one against inspection results and returns, because cheaper fabric that raises rework adds hours, material and capacity to the chair and raises unit cost by the back door.

Accurate unit cost doesn’t make a product cheaper. It makes every pricing and margin decision rest on a record of what happened rather than an assumption about what should have.

Start with one product family. Compare its BOM and routing standards with last quarter’s actual cost, line by line, and find the three lines that moved most. Then look at how StockFlow keeps consumption and stock in step, PurchaseFlow feeds current supplier prices into the standard, and FinanceFlow holds the ledger those allocated rates reconcile to, all within SIX ERP, and talk to a SIX expert about your costing requirements.

SIX ERP connects manufacturing orders, BOMs, routings, stock movements, purchasing and finance in one traceable flow, so the cost you quote is built from the same records the shop floor produces. 

SSIX ERP
Discuss Your Production Cost
Contact SIX ERP to discuss how integrated your product cost and how to optimize it. If your standard cost and your actual cost have drifted apart and nobody can say where, that gap is worth a conversation.

Frequently Asked Questions

Frequently Asked Questions About Production Cost Per Unit

  • Production cost per unit is the average manufacturing cost of producing one finished, saleable product. It includes direct materials, direct labor, and allocated manufacturing overhead. Manufacturers use this figure to evaluate production efficiency, monitor costs, value inventory, and support pricing decisions. For example, if a production batch incurs €12,950 in manufacturing costs and produces 100 good units, the production cost is €129.50 per unit. Selling and general administrative expenses are normally excluded from manufacturing product cost.

  • Calculate production cost per unit by adding total direct material costs, direct labor costs, and manufacturing overhead, then dividing the result by the number of good units produced.

    Production Cost Per Unit = (Direct Materials + Direct Labor + Manufacturing Overhead) ÷ Good Units Produced

    For example, an upholstered chair with €72.00 in materials, €34.50 in labor, and €23.00 in overhead has a production cost of €129.50. The calculation should use consistent cost records and account for rejected units, waste, and rework according to the company’s costing method.

  • The three main components are direct materials, direct labor, and manufacturing overhead. Direct materials include components and raw materials consumed during production. Direct labor covers employee time spent manufacturing the product. Manufacturing overhead includes indirect production expenses such as factory utilities, equipment depreciation, maintenance, and supervision. Together, these components determine the total manufacturing cost. Accurate product costing requires each component to be recorded and allocated using appropriate accounting and operational methods.

  • Standard cost represents what a product is expected to cost based on planned material quantities, labor times, and overhead rates. Actual production cost reflects the costs recorded during manufacturing. The difference is a cost variance. In the article’s illustrative chair example, standard cost is €129.50 and actual cost is €139.50, creating an unfavorable variance of €10.00 per unit, or approximately 7.72%. Comparing these figures helps manufacturers identify changes in purchasing prices, material usage, labor efficiency, and overhead.

  • Direct material cost is calculated by multiplying the required quantity of each component in the bill of materials (BOM) by its unit cost, then adding the results. For an upholstered chair, this may include a wooden frame, foam, fabric, fittings, and packaging. The BOM should reflect current component specifications, quantities, and planned material allowances. Actual consumption should be compared with the BOM to identify excess usage, substitutions, or waste. Outdated component prices and incorrect units of measure can significantly distort production costs.

  • Manufacturing overhead should be allocated using a method that reflects how products consume production resources. Common allocation bases include direct labor hours, machine hours, work center rates, and activity-based costing. For example, an upholstery department may allocate overhead using labor hours, while an automated machining center may use machine hours. A predetermined overhead rate divides estimated overhead by an appropriate expected activity level. Manufacturers should review allocation methods regularly because unsuitable rates can distort product costs, inventory valuation, and profitability analysis.

  • Scrap and defective output can increase the average cost of good products because materials, labor, and overhead have already been consumed. For example, if a batch incurs €10,000 in production costs but only 90 of 100 started units are saleable, the simple average is €111.11 per good unit rather than €100 per unit started. Accounting treatment also depends on whether losses are normal or abnormal. Manufacturers should record rejected units and rework separately to distinguish production inefficiency from expected manufacturing losses.

  • Direct labor cost is calculated by multiplying the working time required for each production operation by the applicable labor rate. A manufacturing routing defines the work centers, operations, and planned times needed to produce the item. For example, 2.30 labor hours at €15 per hour result in €34.50 of direct labor cost. After production, recorded employee hours can be compared with planned hours. This helps identify overtime, inefficient operations, rework, and differences between expected and actual labor consumption.

  • Manufacturers should monitor material consumption, labor time, and production exceptions as work occurs and review significant cost variances regularly. A monthly cost review is a practical starting point for many businesses. Standard costs should also be reassessed when supplier prices, labor rates, production methods, BOMs, or overhead assumptions change materially. High-volume or volatile production environments may require more frequent reviews. The purpose is to detect cost changes early enough to improve operations and adjust future quotations before profitability is affected.

  • ERP software connects product structures, manufacturing operations, purchasing prices, inventory transactions, employee working time, and financial records. This allows manufacturers to calculate standard costs from BOMs, routings, and overhead rates, then compare them with recorded production activity. In SIX ERP, ManufacturingFlow connects production orders and work center operations with StockFlow, PurchaseFlow, and FinanceFlow. These integrated records support investigations into material consumption, labor variances, and actual manufacturing costs without relying on separate spreadsheets.

  • Job costing assigns manufacturing costs to individual production orders, projects, or product batches. It is commonly used in custom furniture, engineering, and make-to-order manufacturing. Process costing accumulates costs across continuous production stages and assigns average costs to units produced. It is more suitable for industries such as food processing, chemicals, and bottling. Process costing may use equivalent units to account for partially completed production. Manufacturers operating both custom and continuous production may require different costing approaches for different product lines.

  • Manufacturers can reduce production cost per unit by improving material planning, minimizing scrap, reducing unnecessary changeovers, optimizing work center capacity, and recording labor accurately. Better purchasing coordination can reduce emergency orders, while reliable production schedules help prevent avoidable overtime. Monitoring actual material consumption and production times reveals where waste occurs. Every cost reduction should also be evaluated against product quality, defect rates, and customer returns. The objective is to produce the same quality with fewer wasted resources.

Read the SIX Business Brief

See how connected ERP workflows improve manufacturing, field service and sales, with measurable results from everyday operations.

Tags

Turn new ideas into better business flows

Every business works differently. Talk with a SIX expert about your goals, processes, and where connected workflows could make a difference. Together, we’ll explore a practical next step for your company.

Learn more about the SIX Business Management solutions

SIX brings every part of your business into one connected environment. Explore our solutions for customer management, sales, service, manufacturing, inventory, purchasing, people, finance, and intelligent automation. Start with the processes you need today and add new capabilities as your business grows, without creating disconnected systems or duplicate data.

AIFlow Logo
Optimize your business with automated AI Flows
Field Service Management Flows end-to-end
Manufacturing Processes
Production from order to ex-factory
Offer to Invoice and Fulfillment
Modern Customer and Lead Management
Warehouse and Inventory Management
Compliant Human Resource Management
Financial Management and Reporting
Purchasing, Procurement and Supplier Management
Professional Procurement from PO to PR

Explore related content

SIX Automation Workflows

How to Automate Business Processes: A Practical Guide

Learn how to automate business processes end to end: map them, pick what to automate first, connect departments in one ERP, and measure the results.

Read More >
Multi-Entity ERP

What Drives Multi-Entity ERP Pricing and Total Cost in 2027

See what drives multi-entity ERP pricing: entities, users, modules, integrations and support, plus a five-year TCO example and a cost evaluation checklist.

Read More >

Best ERP for Supply Chain Management: 10 Picks for 2026

Discover the 10 best ERP systems for supply chain management in 2026, including SIX ERP, SAP, Oracle, Microsoft Dynamics 365, NetSuite, Infor, Epicor, Acumatica, Sage X3, and Odoo. Compare their strengths, limitations, pricing models, and capabilities across procurement, inventory management, manufacturing, warehousing, and logistics. Learn why connected workflows, real-time visibility, and integrated financial data matter more than feature lists when choosing the right ERP for your supply chain.

Read More >