TL;DR - From Project Idea to Profitable Delivery
Successful project management connects scope, people, deadlines, costs, and customer commitments in one controlled process.
Define the project before work begins.
Establish objectives, deliverables, responsibilities, acceptance criteria, and an approved budget.
Connect tasks with available resources.
Plan milestones, dependencies, employee skills, working hours, purchasing, and materials.
Monitor costs while the project is running.
Compare planned and actual hours, expenses, purchasing costs, and projected profitability.
Control scope changes.
Evaluate how additional requirements affect delivery dates, resources, customer approvals, and project margins.
Connect delivery with invoicing.
SIX ProjectFlow brings operational and financial records together to support project completion and profitability analysis.
Managing the Complete Project Lifecycle with SIX ProjectFlow
Projects rarely fail because nobody worked hard. They fail because scope, responsibilities, time, costs and decisions were not managed as one connected process. SIX ProjectFlow brings project planning, tasks, employees, documents, working time, purchasing, expenses, budgets and financial results together, giving every responsible team a reliable view of the project from the first request to final completion.
Project management is more than a task list
A task list explains what people need to do. Complete project management must also explain:- Why the project exists
- What must be delivered
- Who is responsible
- When each activity must be completed
- Which tasks depend on other tasks
- Which employees and skills are required
- How much time and money may be used
- Which documents and approvals are needed
- What has changed since the project started
- Whether the project is still profitable
- When the work can be delivered and invoiced
Why Project Profitability Must Be Measured Before Delivery
A project can meet every deadline and still lose money. The reason is simple: finishing the work does not automatically mean completing it within the approved budget.Consider a company delivering a €50,000 customer project. The original budget includes €35,000 in labor, materials, purchasing, and other costs, leaving an expected profit of €15,000. During execution, additional customer requests, longer working hours, and unexpected purchasing expenses increase the actual cost to €42,000.The project is delivered successfully, but its profit drops from €15,000 to €8,000. The margin falls from 30% to 16%. These figures are illustrative, but the financial problem is common: operational progress and profitability are not the same thing.SIX ProjectFlow connects project activities, working time, purchasing, materials, expenses, and financial information through the wider SIX ERPAn ERP system connects a company’s core processes—such as sales, finance, inventory, manufacturing, and service—in one place so teams can work with shared information. environment. This provides the records needed to compare planned and actual costs while work is still in progress.The important question is not simply whether the project will finish on time. It is whether the project is still expected to deliver the financial result the business originally approved.Project profitability should be managed during execution, not calculated for the first time after the final invoice.The complete project lifecycle
A project moves through several connected stages:| Stage | Main purpose | Typical result |
|---|---|---|
| Demand | Understand why the project is needed | Approved project requirement |
| Definition | Establish scope and expected results | Clear deliverables and acceptance criteria |
| Planning | Organize tasks, time, people and costs | Approved project plan and baseline |
| Execution | Complete the planned activities | Finished tasks and recorded progress |
| Monitoring | Compare the plan with actual results | Current view of delays, workload and costs |
| Delivery | Confirm that the agreed result was provided | Customer or internal acceptance |
| Financial completion | Finalize costs, billing and profitability | Complete financial result |
| Closure | Preserve history and lessons | Closed and traceable project record |
Stage 1: Capturing project demand
Every project begins with a need.The need may come from:- A customer opportunity
- An accepted quotation
- A signed contract
- An internal improvement request
- A product development idea
- A construction or installation requirement
- A compliance obligation
- A maintenance program
- A management decision
- Project name and reference
- Customer or internal owner
- Project manager
- Business objective
- Expected deliverables
- Planned start and completion dates
- _Priority
- Contract or authorization
- Initial budget
- Responsible department
- Project status
Stage 2: Defining scope and deliverables
Scope describes what the project includes and what it does not include.A clear scope protects both the organization and the customer. Without it, teams may continue adding work without changing the deadline or budget. This is known as scope creep.A useful project scope should answer four questions:- What problem must be solved?
- What will the project deliver?
- What work is not included?
- How will completion be accepted?
- Required modules are configured
- Approved data is migrated
- Named users are trained
- Test cases are completed
- Customer approvalAn approval is a formal decision that allows a request or action to proceed. An ERP system can route approvals and record who made each decision. is recorded
- The production environment is active
Stage 3: Dividing the project into manageable work
A large project should not be managed as one task.The project manager divides the complete scope into smaller phases, deliverables and activities. In project management, this structure is often called a Work Breakdown Structure, or WBS.A software implementation might contain these phases:- Process analysis
- Solution design
- System configurationConfiguration sets up software using its existing options. In an ERP system, it adapts workflows, roles and other settings to the company’s business processes.
- Data migration
- Testing
- Training
- Launch
- Post launch support
- Clear task name
- Description
- Responsible employee
- Priority
- Planned start date
- Due date
- Estimated effort
- Current status
- Related milestone
- Required documents
- Dependencies
- Completion criteria
Stage 4: Planning milestones and dependencies
A milestone represents an important project achievement. It does not need to contain many hours of work. Its purpose is to confirm that a major point has been reached.Typical milestones include:- Project plan approved
- Design completed
- Materials delivered
- Prototype accepted
- Installation finished
- Customer testing completed
- Final delivery approved
Stage 5: Planning people, skills and capacity
A schedule is only realistic when the required people are actually available.Assigning a task to an employee does not automatically mean the employee has enough time or the correct competence. The project manager must consider:- Working schedule
- Existing project assignments
- Operational responsibilities
- Planned leave
- Required skills
- Certifications
- Experience
- Location
- Expected task duration
Stage 6: Building the project budget
A project budget is the approved financial plan for completing the work.The budget may include:- Internal labor
- External specialists
- Materials
- Equipment
- Travel
- Accommodation
- Purchased services
- Transportation
- Software or license costs
- Administrative costs
- Contingency funds
Stage 7: Approving the plan and starting the project
Before execution begins, the project should have a clear approved plan.The approval may confirm:- ScopeWhy Managed Cloud ERP
- Deliverables
- Schedule
- Milestones
- Project manager
- Team members
- Budget
- Customer responsibilities
- Reporting method
- Acceptance process
Stage 8: Managing tasks during execution
During execution, plans become real work.Employees should be able to see:- Their assigned tasks
- Current priorities
- Deadlines
- Required documents
- Related milestones
- Previous tasks that must be completed
- Current project status
- Expected output
- Planned
- Ready to start
- In progress
- Waiting
- Blocked
- Completed
- Approved
- Canceled
Stage 9: Recording working time
Working time is one of the most important project measurements.A project may appear to be on schedule while using far more labor than planned. This problem becomes visible only when time is recorded against the correct project and task.Employees should record:- Work date
- Project
- Task or activity
- Hours worked
- Billable or internal classification, when applicable
- Short description
- Approval status
- How many hours were planned?
- How many hours were recorded?
- Which activities required more effort?
- Which employees are overloaded?
- Which work can be billed?
- How much labor cost has the project generated?
Stage 10: Managing project documents
Projects produce many documents.These may include:- Customer requirements
- Quotations
- Contracts
- Technical specifications
- Drawings
- Meeting notes
- Change requests
- Test records
- Acceptance documents
- Invoices
- Completion reports
- What is the current version?
- Who created or approved it?
- When was it changed?
- Which project or task does it support?
- Is it still valid?
- Who may access it?
Stage 11: Purchasing for the project
Some projects require materials, equipment or external services.The project team identifies the requirement, but purchasing manages the supplier process. These responsibilities should remain connected.A project purchase may follow this flow:Project requirement → Purchase request → Approval → Supplier quotation → Purchase order → Delivery → Project costSIX ProjectFlow can connect with SIX PurchaseFlow so the project manager can understand whether required items have been requested, approved, ordered or received.This prevents a common problem: the project schedule assumes that materials are ready, while purchasing is still waiting for approval.The purchasing record should preserve:- Requested item or service
- Required quantity
- Project reference
- Required delivery date
- Supplier
- Purchase price
- Approval
- Order status
- Delivery status
- Actual cost
Stage 12: Connecting warehouse materials
A project may also consume materials already held in inventory.The organization must distinguish between materials that physically exist and materials that are actually available. Some stock may already be reserved for another customer, manufacturing order, service job or project.When SIX StockFlow is enabled, project requirements can be connected with warehouse availability, reservations and material movements.The process may include:- Identify the material requirement
- Check available inventory
- Reserve the quantity
- Prepare a picklist
- Issue the material to the project
- Record unused returns
- assign actual consumption to the project
Stage 13: Managing expenses
Project expenses may include travel, accommodation, transportation, meals, permits, tools and other direct costs.Expenses should be recorded with:- Employee
- Project
- Expense category
- Date
- Amount
- Currency
- Receipt or supporting document
- Approval status
- Customer billable status, when relevant
Stage 14: Controlling changes
Most projects change.The customer may request additional work. A supplier may change the delivery date. A technical issue may require a new solution. Management may change the project priority.Change is not automatically a problem. Uncontrolled change is the problem.A structured change request should explain:- What is changing?
- Why is the change required?
- Who requested it?
- Which tasks are affected?
- Does it change the delivery date?
- Does it require additional people?
- Does it increase cost?
- Does the customer need to approve it?
Stage 15: Managing issues and project risks
A risk is something that may happen. An issue is something that has already happened.For example:- A possible supplier delay is a risk.
- A confirmed late delivery is an issue.
- A possible employee absence is a risk.
- A recorded sick leave is an issue.
- Risk description
- Probability
- Possible impact
- Responsible owner
- Preventive action
- Response plan
- Current status
Stage 16: Monitoring progress
Project monitoring compares the approved plan with actual results.The project manager should regularly review:- Completed tasks
- Overdue tasks
- Upcoming milestones
- Blocked activities
- Planned and actual hours
- Planned and actual costs
- Open purchases
- Unapproved expenses
- Resource workload
- Scope changes
- Customer approvals
- Billing status
Stage 17: Comparing planned and actual results
Project control depends on variance analysis.A variance is the difference between what was planned and what actually happened.Important project variances include:Schedule variance
Are tasks and milestones being completed on time?Effort variance
Are employees using more or fewer hours than expected?Cost variance
Is the project spending more or less than the approved budget?Scope variance
Is the team delivering work that was not part of the approved scope?Resource variance
Are different employees or skills being used than originally planned?A variance is a signal that requires explanation. It is not always bad.A project may spend more on equipment but require fewer labor hours. Another project may finish early because part of its scope was removed.SIX ProjectFlow keeps the underlying project records available so managers can understand the reason behind the number.Stage 18: Controlling project profitability
Revenue does not equal profit.A project can produce a large invoice and still lose money if labor, purchases, materials, expenses and rework are too high.A simplified project profitability calculation is:Project profit = Project revenue − Total project costTotal project cost may include:- Internal labor
- External labor
- Purchased goods
- Materials consumed
- Travel and employee expenses
- Transportation
- Equipment
- Rework
- Other direct costs
Stage 19: Customer communication and approvals
Customer projects require clear communication.Important decisions should not remain only in phone calls or personal email accounts. The project should preserve the business result of the communication.This may include:- Approved requirements
- Meeting decisions
- Requested changes
- Delivery confirmations
- Test results
- Rejected work
- Corrective actions
- Final acceptance
Stage 20: Delivery and acceptance
A project should not be considered complete simply because all internal tasks are closed.The agreed deliverables must be reviewed and accepted.The delivery process may include:- Internal quality review
- Completion of open corrections
- Delivery to the customer or internal owner
- Acceptance testing
- Signing of an acceptance document
- Confirmation of the completion date
- Approval for invoicing
Stage 21: Project billing and financial completion
Different projects use different billing methods.Common methods include:- Fixed price
- Time and materials
- Milestone billing
- Periodic billing
- Advance payment
- Retainer
- Cost reimbursement
- Mixed billing
- Approved work
- Billable hours
- Billable expenses
- Delivered quantities
- Accepted milestones
- Previous invoices
- Advance payments
- Remaining contract value
- Open change requests
Stage 22: Closing the project
Project closure is a controlled process, not just a status change.Before closing the project, the manager should confirm that:- Deliverables are accepted
- Open tasks are resolved
- Required documents are stored
- Time entries are complete
- Expenses are submitted
- Purchase orders are reviewed
- Materials are returned or consumed
- Final invoices are prepared
- Customer obligations are complete
- Access rights are adjusted when necessary
- Final costs and revenue are reviewed
Stage 23: Learning from project results
Every completed project provides useful information.The organization should compare:- Estimated hours with actual hours
- Planned costs with actual costs
- Planned dates with actual dates
- Expected margin with actual margin
- Original scope with final scope
- Expected risks with real issues
- Planned resource use with actual assignments
How ProjectFlow connects with the wider SIX ERP platform
Project management touches almost every part of the organization.SIX CustomerFlow
Connect enquiries, opportunities, quotations, customer commitments and communication with the resulting project.SIX PeopleFlow
Use employee records, skills, working time, attendance and leave information when planning and recording project work.SIX PurchaseFlow
Turn project requirements into controlled purchase requests, supplier quotations, approvals and purchase orders.SIX StockFlow
Check availability, reserve materials, create picklists and record material consumption against the project.SIX ManufacturingFlow
Connect project deliverables with manufacturing orders when a customer project requires internally produced goods.SIX ServiceFlow
Continue from project delivery into installation, field service, maintenance or after sales support.SIX Expenses
Assign employee and operational expenses to the correct project and approval process.SIX Financial Management
Connect project costs, invoicing, revenue and financial reporting to understand the complete business result.SIX Documents and Contracts
Keep contracts, specifications, approvals, acceptance records and other controlled documents connected with the project.The exact workflowA workflow defines the steps, responsibilities and decisions needed to complete work. An ERP system can guide tasks through these stages and show progress. depends on the SIX ERP modules enabled and the organization’s configured processes.Different industries require different project structures
The basic project lifecycle remains consistent, but the details change between industries.Software and ERP implementation
The project may include analysis, configuration, development, data migration, testing, training and launch. Customer approvals and change control are especially important.Construction and installation
Projects depend on locations, materials, subcontractors, permits, equipment and scheduled work phases. Delayed materials can affect several teams and milestones.Engineering
Technical drawings, revisions, prototypes, testing and specialist qualifications require strong document and competence control.Professional services
Working time, employee utilization, customer communication and billable activity have a direct effect on profitability.Marketing and creative services
The process may contain briefs, concepts, reviews, revisions, customer approvals and final asset delivery. Uncontrolled revisions can quickly consume the project margin.Product development
Projects may contain research, design, testing, manufacturing preparation, compliance checks and controlled product revisions.Internal transformation
ERP implementation, process improvement and compliance projects often involve several departments. Responsibilities, decisions and management support must remain visible.SIX ProjectFlow provides a common project structure while allowing each organization to configure its own phases, task types, responsibilities and reporting requirements.The responsibilities of the project team
A connected system does not remove human responsibility.Project sponsor
Approves the business purpose, budget and major decisions.Project manager
Plans the project, coordinates resources, monitors progress and manages changes.Task owner
Completes the assigned activity and records accurate status and time information.Department manager
Confirms resource availability and supports workload decisions.Purchasing team
Manages supplier selection, ordering and expected delivery.Finance team
Reviews costs, billing, revenue and financial completion.Customer or internal owner
Confirms requirements, provides decisions and accepts deliverables.SIX ProjectFlow gives each role access to the information required for its responsibility. Permissions should prevent employees from viewing or changing information outside their authority.Project data must be current and reliable
A project platform is only useful when people maintain accurate information.The organization should establish clear rules for:- Creating projects
- Naming tasks
- Assigning responsibilities
- Updating statuses
- Recording time
- Submitting expenses
- Approving changes
- Closing milestones
- Storing documents
- Completing projects
Common project problems and how connected information helps
Unclear scope
The team does not know exactly what must be delivered. A documented scope and acceptance criteria create a shared reference.Hidden delays
Employees know that work is late, but management learns too late. Current task and milestone statuses make delays visible earlier.Overloaded employees
The same people are assigned to too many projects. Connected resource and working time information supports better planning.Missing materials
Work is scheduled before materials are purchased or reserved. PurchaseFlow and StockFlow provide current supply information.Unrecorded work
Employees perform extra work without creating a change request. Controlled scope and change records protect time and profitability.Late time entries
The project appears profitable because labor has not been recorded. Regular timesheets improve cost accuracy.Disconnected expenses
Travel and external costs remain outside the project record. Project linked expenses reveal the true cost.Billing delays
Finance waits for confirmation that work is complete. Connected milestones and acceptance records support faster invoicing.No project history
Documents and decisions disappear after completion. A closed and traceable record protects business knowledge.Building a stronger project management process
Organizations introducing SIX ProjectFlow should begin with process clarity.A practical implementation sequence is:- Define project types
- Establish standard project phases
- Create task and milestone rules
- Define project roles
- Decide how time will be recorded
- Establish budget and cost categories
- Define purchasing and inventory connections
- Create change approval rules
- Define billing methods
- Establish closure requirements
- Select management reports
- Train users by role
ProjectFlow Is More Than Standalone Project Management
Traditional project management tools focus mainly on tasks, deadlines, assignments, and collaboration. These functions are important, but many projects depend on information that exists outside the project plan.An installation project needs materials from the warehouse. A product development project may require manufacturing orders. A customer implementation depends on employee availability, purchasing, expenses, and customer approvals. Every project eventually needs financial control.SIX ProjectFlow connects project activities with the wider SIX ERP environment. Project tasks can be related to customers, purchasing requirements, inventory movements, employees, manufacturing activities, and financial records, depending on the modules and workflows configured.This helps project managers answer questions that a disconnected task list cannot easily resolve. Are the required materials available? Have suppliers confirmed delivery dates? Are the right employees assigned? How much labor has already been consumed? Which costs are still waiting for approval or invoicing?The advantage is not simply managing more tasks. It is managing tasks in the context of the business processes, resources, and costs they depend on.This makes ProjectFlow relevant to manufacturing, field service, installation, engineering, internal transformation, and customer delivery projects—not only conventional project-based businesses.The management result
SIX ProjectFlow turns project management into one connected operating process.Project managers can see work, deadlines, resources and costs together. Employees understand their assignments and priorities. Purchasing sees what the project requires. Finance receives clearer cost and billing information. Leadership gains a more reliable view of delivery risk and profitability.The complete flow becomes:Business need → Scope → Plan → Resources → Tasks → Time and costs → Delivery → Billing → Closure → LearningThe result is more than an organized task list. It is a complete project record that connects people, work and financial performance.With SIX ProjectFlow, organizations can plan more realistically, respond to change earlier, control costs more accurately and preserve the information needed to improve every future project.Frequently Asked Questions
Frequently Asked Questions About ERP Project Management
What is ERP project management?
ERPAn ERP system connects a company’s core processes—such as sales, finance, inventory, manufacturing, and service—in one place so teams can work with shared information. project management is the process of planning, executing, monitoring, and controlling projects within an integrated Enterprise Resource PlanningAn ERP system connects a company’s core processes—such as sales, finance, inventory, manufacturing, and service—in one place so teams can work with shared information. system. Unlike standalone task management tools, ERP connects project activities with employee resources, purchasing, inventory, budgets, and financial records. This gives project managers a clearer view of deadlines, responsibilities, resource availability, and costs. It also helps businesses manage projects from the initial idea and planning stages through execution, customer acceptance, invoicing, and profitability analysis.
How does ERP help track project profitability?
ERP helps track project profitability by connecting planned budgets with actual labor costs, material consumption, purchasing expenses, subcontractor charges, and customer revenue. Project managers can compare estimated and actual costs while work is progressing rather than waiting until delivery is complete. For example, if additional working hours increase project costs, the financial impact becomes visible before the final invoice. SIX ProjectFlow, together with FinanceFlow and other connected modules, provides the operational records needed to monitor costs, identify budget deviations, and evaluate project margins.
How does SIX ProjectFlow connect project tasks with employee timesheets?
SIX ProjectFlow connects project tasks with employee assignments, responsibilities, deadlines, and recorded working time. Through its connection with SIX PeopleFlow, companies can relate employee time records to project activities. This helps managers compare planned effort with actual hours, monitor resource usage, and identify tasks consuming more time than expected. When appropriate labor rates are configured, recorded hours can also support project costing and profitability analysis.
Can SIX ERP connect project purchasing, inventory, and financial records?
Yes. SIX ERPAn ERP system connects a company’s core processes—such as sales, finance, inventory, manufacturing, and service—in one place so teams can work with shared information. connects project management with purchasing, warehouse operations, and finance through its integrated Flows. SIX PurchaseFlow manages supplier orders and project-related purchasing requirements, while SIX StockFlow provides information about materials and inventory movements. SIX FinanceFlow connects financial transactions, expenses, and invoicing. This allows project managers to monitor operational progress alongside material availability and costs, reducing manual reconciliation between departments.
How can project managers prevent scope creep and budget overruns?
Project managers can reduce scope creep by defining clear deliverables, responsibilities, acceptance criteria, and an approved budget before work begins. Every additional customer requirement should be documented and evaluated for its impact on working hours, purchasing costs, resources, and delivery dates. Changes should receive approvalAn approval is a formal decision that allows a request or action to proceed. An ERP system can route approvals and record who made each decision. before implementation. SIX ProjectFlow helps organize tasks, milestones, project documentation, and cost information, allowing managers to compare planned and actual performance and identify budget deviations before they become serious problems.
What is the difference between project management software and ERP-integrated project management?
Traditional project management software primarily manages tasks, deadlines, milestones, team collaboration, and project progress. ERP-integrated project management connects these activities with broader business processes, including employee timesheets, purchasing, inventory, customer records, and finance. With SIX ProjectFlow, project activities can be linked to relevant business records across the SIX ERPAn ERP system connects a company’s core processes—such as sales, finance, inventory, manufacturing, and service—in one place so teams can work with shared information. environment. This helps managers understand not only whether tasks are completed, but also which resources were consumed, what the project costs, and whether it remains profitable.